What is Chapter 33 NYC DOB?
The provisions of this chapter shall govern the conduct of all construction or demolition operations with regard to the safety of the public and property. In addition to the requirements of this chapter, construction or demolition operations shall also be conducted in conformance with the New York City Fire Code.
What must be done 24 48 hours prior to starting an excavation?
All Contractors with permits to conduct earthwork (excavation) must notify the Department before work may begin. Contractors must give the Department 24 to 48 hour notice before beginning excavation, rock blasting, or rock chipping.
Which of the following situations requires a property owner to set up a sidewalk shed in NYC?
Sidewalk sheds are temporary structures built to protect people or property. Property owners must install a shed when constructing a building more than 40 feet high, demolishing a building more than 25 feet high — and when danger necessitates this type of protection.
How tall is a parapet?
30 inches
The height of the parapet shall be not less than 30 inches (762 mm) above the point where the roof surface and the wall intersect.
Is a permit required for a two point suspended scaffold suspended from a parapet using C-hooks?
A permit is not required for a two-point suspended scaffold suspended from a parapet using C-hooks. 2.3 The installation, use, and removal of the scaffold is confined within the site or over an area protected by sidewalk sheds or roof protection.
How do I find my DOB violation?
DOB violations, like ECB violations are public information and can be accessed on line through the NYC BIS (Building Information System) at You can search your property by block and lot, or street address to find out if your property has received any type of violation.
What are DOB violations?
A DOB Violation is a notice that a property is not in compliance with some provision of applicable law and includes an order from the Commissioner of the Department of Buildings to correct the violating condition. DOB violation information is public and will appear in a property title search.
How is underpinning done?
Underpinning may be accomplished by extending the foundation in depth or breadth so it either rests on a more supportive soil stratum or distributes its load across a greater area. Use of micropiles and jet grouting are common methods in underpinning.
How tall can a fence be in NYC?
10 feet
The NYC Building Code generally allows a maximum fence height of 10 feet, and the NYC Zoning Resolution outlines additional height limits: Residential districts: 6 feet, BC §3112.1. Residential front yard fences: 4 feet, ZR §23-44. Residential side of corner lot: 6 feet, ZR §23-44.
Is a permit required for a two point suspended scaffold suspended from a parapet using C hooks?
What’s new in Chapter 33 of the NYC Building Code 2014?
2014 NYC Building Code, Chapter 33 *Underlined text is new text added to the 2014 edition of Chapter 33. [Text in brackets is text in the 2008 edition that is being deleted in the 2014 edition of Chapter 33.]
What’s new in Chapter 33 of the 2014 code?
3301.1.3 Manufacturer specifications. All equipment shall be used in accordance with the specifications of the manufacturer, where such New section added to the 2014 Code; codifies best practice to follow manufacturer specifications. *Underlined text is new text added to the 2014 edition of Chapter 33.
What is section BC 3301 general?
Change Between 2008 and 2014 Editions* Explanation of Change SECTION BC 3301 GENERAL 3301.1 Scope. The provisions of this chapter shall govern the conduct of all construction or demolition operations with regard to the safety of the public and property.
Is there a legal disclaimer in Chapter 33 of Chapter 33?
[Text in brackets is text in the 2008 edition that is being deleted in the 2014 edition of Chapter 33.] LEGAL DISCLAIMER: The information in this document is a summary and overview and is not intended to substitute for any law, rule or regulation. The information contained in this document is current only as of September 30, 2014.