What are the stages of the RIBA plan of work?

What are the stages of the RIBA plan of work?

There are 8 stages in the RIBA Plan of Work, numbered from 0 to 7.

  • 0: Strategic Definition.
  • 1: Preparation and Briefing.
  • 2: Concept Design.
  • 3: Spatial Coordination.
  • 4: Technical Design.
  • 5: Manufacturing & Construction.
  • 6: Handover and Close Out.
  • 7: In Use.

What is Stage 3 of the RIBA plan of work?

RIBA Stage 3: Spatial Coordination Formerly known as the ‘Developed Design’ stage, this is where the practical aspects of the concept are decided. For instance, at Stage 3 your design team should be thinking about how your project will meet legal requirements, such as building regulations.

What does Stage 3 design mean?

Developed Design
Stage 3: Developed Design Concept Design is further developed, and the design work of the core designers is progressed. By the end of Stage 3, the architectural, building services and structural engineering designs will all have been developed and will have been checked by the lead designer.

What are Stage 4 drawings?

Stage 4. Technical Design is a refinement of the existing design, essentially preparing the necessary drawings and documentation for tendering. It often involves approaching relevant specialist subcontractors, such as a glazing manufacturer, or joinery firm.

What is the purpose of the RIBA plan of work?

The RIBA Plan of Work organises the process of briefing, designing, constructing and operating building projects into eight stages and explains the stage outcomes, core tasks and information exchanges required at each stage.

Why is RIBA Plan of Work important?

The RIBA Plan of Work was initiated in 1963 to provide a framework for architects to use on projects with their clients, bringing greater clarity to the different stages of a project. It has evolved over the years to reflect changing trends in project approaches and has become an industry-wide tool.

What is RIBA Stage 3 plus?

Stage 3 is not about changing the concept. It is about design studies for portions of the building, detailed engineering analysis, adding detail to project strategies and getting the cost plan right.

What is riba stage tendering?

This is usually done at RIBA Stage 4 so that the tendering contractors receive the most detailed information to base their bid on. The bidding contractors are given a predetermined amount of time to submit their tenders.

What is the purpose of RIBA Plan of Work?

What is RIBA plan of works used for?

What is the RIBA Plan of work?

The RIBA plan of work was revised in 2013 and comprises of eight separate work stages that each address a required phase of a construction projects progression, from inception through to completion. Each stage has clear tasks and outputs, which offer as both a process map and a management tool.

What are the stages of the RIBA tender process?

Stages 2, 3 and 4 are the main design stages of the RIBA plan of work. As with planning, the stage at which the tender process occurs may vary; traditionally it is done at the end of stage 4 however. This is mainly due to the level of detail needed by contractors to price their works correctly.

When do I need planning consent for my RIBA project?

Due to the adaptability of the RIBA Plan of Work, submission time for planning consent may vary between the stages, but it usually occurs during or at the end of stage 3. A planning application requires a degree of detail in drawings and information that is dependent on your type of project. In general, it will include:

Which drawings are required for RIBA stages 2020?

Initial structural drawings (i.e. sketches of grids, no BIM required by engineers). However, this needs to be confirmed by the project team and client if 2D or 3D models are required. There is a risk on progressing too much with a detailed 3D structural model due to later changes at stage 3 of RIBA stages 2020.